翻訳と辞書
Words near each other
・ Planorbidella depressa
・ Planorbidella planispira
・ Planorbis
・ Planorbis carinatus
・ Planorbis corinna
・ Planorbis kahuica
・ Planorbis planorbis
・ Planmeca
・ Planmed
・ Planned Australian offshore combatant vessel
・ Planned Canadian Forces projects
・ Planned change
・ Planned community
・ Planned destruction of Warsaw
・ Planned economy
Planned extension of the Helsinki tram network
・ Planned French invasion of Britain (1744)
・ Planned French invasion of Britain (1759)
・ Planned giving
・ Planned high-speed rail by country
・ Planned Invasion
・ Planned liberalism
・ Planned London Underground stations
・ Planned maintenance
・ Planned Maintenance System in shipping
・ Planned Mexico City international airport
・ Planned obsolescence
・ Planned Parenthood
・ Planned Parenthood 2015 undercover videos controversy
・ Planned Parenthood Federation of America, Inc. v. Bucci


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Planned extension of the Helsinki tram network : ウィキペディア英語版
Planned extension of the Helsinki tram network

Helsinki Transport Council have made plans for a radical expansion of the tram network within the next 20–30 years. Below is a list of confirmed and proposed future expansions of the network. The construction of some of the expansions listed below as trolleybus lines was studied in a 2009 report by Helsinki City Transport,〔Helsingin Sanomat〕〔Helsingin Kaupungin Liikennelaitos〕〔Mirva Haltia-Holmberg〕 but the city decided to drop the trolleybus plans for the foreseeable future in 2011.
==Reorganisation of the tram lines==

The board of Helsinki Region Transport (HSL) approved a plan for the reorganisation of the tram lines on 10 February 2015.〔(【引用サイトリンク】title=Raitioliikenteen linjastosuunnitelma )〕 The plan is meant to respond to the changing transportation needs as the new districts of the city in former brownfield sites (Jätkäsaari, Hernesaari, Kalasatama, Keski-Pasila, Kruunuvuorenranta) are built. The reorganisation is to be carried out in stages in 2016–24. The concept of the plan is to make the most of the existing track network and to assume only minimal construction of new track. According to the plan, the 2/3 and 7A/7B loops will be changed to linear routes and a new, short, peak-time line number 5 from Katajanokka ferry terminal to the Central Railway Station will serve ferry passengers. Jätkäsaari will be served by lines 7, 8 and 9, and line 6 will be routed to the new district of Hernesaari. The tramway to the new district of Kruunuvuorenranta over a new, kilometre-long bridge was left to be planned separately, as the design of that line is dependent on a number of other decisions, including whether to close down the Hanasaari coal-fired power plant. The ten lines in 2024 according to the plan are as follows〔(【引用サイトリンク】title=Raitioliikenteen linjastosuunnitelma, kokonaiskartta, tilanne 2024 )〕 (see reference for a map):
# Eira – Käpylä (via Töölö)
# Kaivopuisto – Pasila
# Kaivopuisto – Meilahti
# Katajanokka – Munkkiniemi
# Katajanokka ferry terminal – Central Railway Station
# Hernesaari – Arabia
# Jätkäsaari – Meilahti (via Kallio and Pasila)
# Jätkäsaari – Arabia
# Jätkäsaari – Ilmala
# Kirurgi – Pikku Huopalahti

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Planned extension of the Helsinki tram network」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.